Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Guangxi Nanning Zhengxu New Energy Technology Co., Ltd.

Solar air energy floor heating

sell
  • There is no classification
contact
  • Contact:正旭
  • Phone:0771-3396606
  • fax:0771-2022521
search
 
link
  • There is no link yet
home > sell > The largest water treatment equipment manufacturer in Nanning City
The largest water treatment equipment manufacturer in Nanning City
products: Views:4The largest water treatment equipment manufacturer in Nanning City 
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-07-08 08:33
 
Details

Nanning balcony solar energy, Nanning wall-mounted solar energy, Nanning solar energy installation With the progress of society, there are more and more high-rise buildings. Traditional solar water heaters can no longer meet the installation needs of high floors. Based on this fact and phenomenon, our company successfully launched the balcony wall-mounted space energy water heater in 2018 after years of research and development.
Main products: Guangxi floor heating installation, Nanning floor heating installation, Guangxi water floor heating, Guangxi solar energy, Nanning air energy
The winning building in the built environment category of the Architecture Award is the Harmonia office building. The building was designed by r Architectural Company (Paris, France/São Paulo, Brazil) and completed in 2011.
The criteria for judging the built environment category are: buildings, engineering or urban planning projects built within the past two years that can meet sustainable living and future requirements. The winner will receive a prize of 10,000 euros.
French-Brazilian architect R was commissioned to design a multi-functional office building. The client's requirement was that the internal layout of the building should be flexible and versatile.
The Harmonia office building has a plant facade. The walls of the facade are covered with a thick layer of plants, which acts like a skin for the building. This is a concrete wall with holes drilled in it and plants planted there.
The project's hydropower system was built with energy in mind, using low-tech materials such as a simple irrigation system and new water treatment equipment. In addition, a large rainwater reuse system in the building provides a good thermal environment for the building and can store a large amount of water without building expensive water storage facilities. The role of green roofs is very wide: bringing fresh air to the building, improving the air environment inside the building, storing a small amount of rainwater, and guiding excess rainwater into the ground. The stored rainwater can be used to supply toilets and irrigation systems.
In addition, the building was shut down during construction. On this day, an event was held in this unfinished building - a public art exhibition. In this exhibition, workers and artists come together to talk and talk with each other.
Request for quotation
A total of0articles  Related Comments: